TECHNICAL REFERENCE

Responsiveness to the Refinery Needs

 

Failure to respond quickly is probably one of the most serious problems in the FCCU valve industry. Valve companies tend to not get back to your inquiry or request for information. 

BLAC INC. wants to be your source for information that comes back quickly and with the correct information. Our inside sales group is available and will get back to you when you need. 

Please contact us when you have an operational problem or you need help with your valves.

 

Turnaround Replacement Parts

Replacement Parts Required Each Turnaround

Erosion of internal components is normal in slide valves. It is common in many refineries to simply replace these components at turnaround. However, parts should seldom be replaced until after having been rebuilt several times. 

There are valve manufacturers that purposely design valve components to require replacement every TA. We believe this is a wrong approach because the refinery should not have to purchase parts every time the unit is down. Our design capability solves these problems that cause parts to be replaced, saving the refinery money and time in the turnaround schedule.


Improper Stuffing Box Purge

Purge media to a slide valve bearing sleeve is required to keep particles and process gas from entering the slide valve packing. A loss of purge flow may cause the slide valve to stick, coke to form around the stem, or packing failure, leading to a loss of containment of the process. 

Too high a purge flow, and the valve stem, disc or orifice plate may erode prematurely, causing a unit shutdown. This relatively small flowrate must be controlled within a narrow range to be most effective.

BLAC INC. provides different solutions to this problem. These systems are direct replacements for older style, restriction orifice based, purge systems.

Intelligent Purge – The system consists of a flow meter, a manifold block, a pressure transmitter, a control valve, an assembly bypass valve and check valve. The signals from the flow meter and pressure transmitter are transmitted to a PLC, which controls the proportioning flow control valve. The flow of the purge media is monitored and an alarm generated if the valve position or flow deviates from the set point.

Manual Purge – A flowmeter measures the actual flow of purge media to the valve bearing sleeve and packing inside the stuffing box. The purge flowmeter compensates for variations in process pressure, ensuring accurate readings. The purge flow is manually adjusted using a needle valve. Flow is indicated both locally and at the refinery control room, to ensure reliable purge that can be confirmed by the operations staff.

Automated Purge – This is the solution for automated control of the purge media to the valve. A flowmeter measures the actual flow of purge media to the valve bearing sleeve and packing inside the stuffing box. The purge flowmeter compensates for variations in process pressure, ensuring accurate readings. The flow is controlled to a setpoint that ensures reliable operation. This is a set and forget it operation. 

Automated Purge Guarantee – With the use of a BLAC INC. Automated Purge System, combined with the BLAC INC. PM program, we will guarantee the cost of damage that occurs to the valve stem due to purge failure.

See our Valve Packing Gland (Stuffing Box) Purge Control Panels for solutions including:

 

BLAC INC. FCC Slide Valve Emergency Shutdown Functions

When BLAC INC. was founded in 1990, our goal was to build electro-hydraulic actuators. The emphasis was to manufacture FCC slide valve and butterfly valve actuators that were the best in the industry with the highest reliability and best-in-class maintainability. We believe that we have achieved these goals.

When FCC refiners and licensors began specifying dedicated emergency shutdown (ESD) functions for valves, BLAC INC. responded by designing the most reliable system in the industry. The UOP Electrohydraulic Actuators specification has been considered the industry baseline to follow since 1979.

In the mid-1990s, UOP specified the use of two (2) ESD solenoid valves, wired in series (2 out of 2), so that a failure of one solenoid valve would not cause a nuisance shutdown of the FCC unit. At that time, the refining industry was more worried about unintended shutdowns of the FCC unit rather than failures to trip due to a solenoid not working properly.

After all, until the late 1990s most FCC units in the world did not have an automated shutdown system. Some refiners even used a single “energize to trip” ESD solenoid to avoid nuisance shutdowns.

Except for the 2oo2 solenoid configuration, UOP did not specify how the rest of the hydraulic system was to be configured. This was left up to each vendor. 

Unlike other vendors though, BLAC INC. selected to incorporate redundant ESD hydraulic valves in the ESD circuit which provided enhanced ESD system availability. 

 

2oo2 Voting Emergency Shutdown System

For 2oo2 voting, the two (2) ESD solenoids are powered by the refinery SIS. When both ESD solenoids are de-energized, hydraulic pressure opens the ESD hydraulic valves, causing full pressure and flow to one side of the cylinder, and releasing pressure to tank on the other side of the cylinder. This moves the valve as fast as possible to the ESD position (generally 2 seconds for slide valves, down to 0.3 seconds for butterfly valves).

The signals to the ESD solenoids are monitored by relays, wired in parallel to the ESD signals. When both ESD solenoids are de-energized, the Lock-in-Place solenoid also de-energizes, isolating the servo valve. This avoids the position control servo valve from fighting the ESD function. However, while this extra step is an extra safety measure, the ESD function is inherently able to override the modulating servo control.

The “ESD Test” switch can be used to regularly check that the ESD function works without causing the valve to move. When the switch handle is moved out of “Normal” mode, an alarm is generated to alert the operations staff that the ESD function has been bypassed for testing. In the “Test” position, the solenoids can be safely de-energized for the test.

This 2oo2 ESD function system can be added or retrofitted to virtually any hydraulic system that needs to have a failsafe function. We have performed this modification on several systems worldwide and on the equipment from multiple hydraulic system manufacturers.

 
BLAC INC. 2oo2 ESD Function

BLAC INC. 2oo2 ESD Function


2oo3 Voting Emergency Shutdown Function

The 2oo2 ESD function was the standard offering until 2016 when BLAC INC. developed a 2 out of 3 voting ESD solenoid system. 

While the 2oo2 solenoid ESD function has been very successful for 30 years, demand for more reliability and availability has led to the use of 2 out of 3 voting for many facets of refinery SIS systems.

BLAC INC. developed the 2oo3 voting ESD system to be used both in new systems as well as a retrofit replacement for older 2oo2 systems. 

The three (3) ESD solenoids are powered by the refinery SIS. When the solenoids are energized, hydraulic pressure holds the ESD hydraulic valves in the closed position, permitting normal modulating operation of the slide valve.

When any 2 out of 3 (2oo3) solenoids are de-energized, hydraulic pressure is removed from the ESD hydraulic valves, causing full pressure and flow to one side of the cylinder and releasing pressure to tank on the other side of the cylinder.

This moves the valve as fast as possible to the ESD position (generally 2 seconds for slide valves or down to 0.3 seconds for butterfly valves in expander turbine systems, depending on application and specifications).

BLAC INC. 2oo3 ESD Function

BLAC INC. 2oo3 ESD Function

The signals to the ESD solenoids are monitored by relays, wired in parallel to the ESD signals. When 2oo3 ESD solenoids are de-energized, the Lock-in-Place solenoid will de-energize, isolating the servo valve. This avoids the position control servo valve from fighting the ESD function.

Each solenoid valve is monitored by a pressure gauge and a pressure transmitter. When an individual solenoid is de-energized, its corresponding pressure gauge and transmitter will show the pressure draining from operating pressure to zero.

A fourth pressure gauge and transmitter are used to monitor the result of the 2oo3 vote. This pressure gauge will show zero (0) pressure when the system is tripped by multiple ESD solenoids being de-energized.

The “ESD Test” switch can be used to regularly check that the ESD function works, without causing the valve to move. When the switch handle is moved out of “Normal” mode, an alarm is generated to alert the operations staff that the ESD function has been bypassed for testing. In the “Test” position, all solenoids can be safely de-energized simultaneously for the test.

However, if desired, each solenoid can be de-energized one at a time without bypassing or placing the “ESD Test” switch in “Test” position. 

Again, this 2oo3 ESD system can be added on to other hydraulic manufacturers systems to provide emergency trip functions. 

 

Safety Integrity Level (SIL)

More and more refiners are requesting that FCC actuator vendors supply “SIL Rated” systems. 

The relevant standards (ANSI/ISA S84.01 and IEC 61511) apply a SIL to a “Safety Instrumented Function”. The Safety Instrumented Function is not simply the ESD solenoids, but the entire hydraulic system (and indeed, the entire SIF loop from process measurement to logic solver to final control element) that performs the ESD function. 

This includes the reservoir, pumps/motors, accumulators, nitrogen precharge, tubing, hydraulic valves, solenoids, hoses and cylinder. It also includes the diagnostic coverage of the instrumentation as well as online redundancies and backup systems.

To determine the SIL of the “Safety Instrumented Function”, the probability of failure on demand (PFD) of each component should be evaluated, and the system as a whole analyzed.  BLAC INC. hired Kenexis Consulting to provide a 3rd party analysis (using the Fault Tree Analysis method) of the entire system function to determine the PFD and SIL of the ESD functions as well as the nuisance trip rate.

The calculated SIL for the ESD actuator function is listed in the following table:

 
ESD Style Fluid Type ESD Solenoids
and Type
ESD Hydraulic Valves SIL
2oo2 Mineral Oil 2, Normally Open Redundant 2, with 5 year test interval
2, with 1 year test interval
2oo3 Mineral Oil 3, Normally Closed Simplex 1, with 5 year test interval
2, with 1 year test interval
2oo3 Mineral Oil 3, Normally Closed Redundant 2, with 5 year test interval
3, with 1 year test interval
 

The above SIL ratings are based upon inclusion of specific features and system diagnostics. The nitrogen precharge of the Emergency Accumulators must be always monitored to maintain any SIL rating.

Further, the fluid cleanliness is a major factor in achieving SIL rated systems. If the fluid is not cleaned properly and continuously, then the fluid performance degradation will result in a higher failure probability, reducing the SIL.

Therefore, BLAC INC. provides a hydraulic fluid water and particulate removal system that functions continuously and is monitored for display on refinery BPCS/DCS screens and on the local HMI at the hydraulic control stations. In addition, the fluid type basis is mineral oil. Water-glycol fluids have degraded performance versus mineral oil and should not be used.

All diagnostic monitoring is continuously recorded by the BLAC INC. Intelligent Monitoring Controls and will always confirm performance during operation.

 

BLAC INC. ESD Functions and SIL Summary

BLAC INC. has provided the technical information on FCC Slide Valve Emergency Shutdown (ESD) Functions and Safety Integrity Level (SIL) for the purpose of technical evaluation and comparison. We believe it is important to review the operation of this functionality since safety and ultimate reliability are primary concerns.

It is not sufficient to simply use 3 ESD solenoid valves with no ‘logic’, no diagnostic monitoring, simplex hydraulic valves, no accumulator precharge measurement, or no continuously operating fluid cleaning systems. 

We therefore believe that the design we are offering is far superior to other electro-hydraulic actuator emergency shutdown functions available in the marketplace.

 

Goggle Valve Cylinder Replacement

Goggle Valve Cylinders Replacement for Z&J Supplied Goggle Valves

BLAC INC. manufactures a cylinder to replace the OEM Cylinders built for Z&J Goggle Valves. 

The cylinders we manufacture have several key improvements to the design to prevent problems that occur with the Z&J cylinders:

  • Body of cylinder is constructed from High Strength Aluminum instead of the steel OEM cylinders.

  • Repair of the cylinder can be done in place. Existing OEM cylinders must be removed and taken to a shop to be refurbished.

  • Improved seal design over the extremely poor seal design in OEM cylinders that leak within months in most cases.

  • Cylinder bore is improved in size to provide more force to unclamp.

  • Rear cylinder rod is provided for manual operation and has a seal to protect from leakage. OEM cylinder does not have a seal.

  • Limit switch mounting is much improved to gain reliability for limit switch action.

  • Air is purged through the spring assembly.

  • Continuous circulation of oil is provided to the cylinder through ports with less pressure drop than OEM. The OEM systems sometimes have enough pressure drop that the unclamping process can take place inadvertently instead of upon command.

  • Seals for the cylinder are guaranteed by BLAC INC. for 5 years operation with no leakage. This technology has been proven in hundreds of applications.

BLAC INC. Goggle Valve Cylinders

BLAC INC. Goggle Valve Cylinders

 
OEM Installed Cylinder for Goggle Valve

OEM Installed Cylinder for Goggle Valve